Fleet Equipment Registry
Author equipment types, jobs, spares and manuals once in a fleet master catalogue, then install them on any vessel.
The registry is the office-side master catalogue of equipment in E-PMS. Each equipment type is authored once, with its structure, spare catalogue and maintenance jobs, and a vessel gets that equipment by having the type installed. Because jobs and spares live on the master, an edit made here applies fleet-wide to every vessel carrying the type.
Types, Models and Groups
Equipment is organised under SFI system headers. A generic type defines the common jobs; its models are the concrete maker and model units vessels actually install, and they inherit the type's jobs unless told otherwise. Groups such as tanks are not installed themselves but can carry group jobs, such as enclosed-space entry, that cascade to everything nested under them.
Jobs with a Basis
Every maintenance job carries its interval (calendar or running hours), a maintenance basis (maker, class, statutory, company experience or condition), the responsible rank, whether approval is needed to start, flags for safety, class, shutdown and required risk assessment, a description, readings with limits, a bill of materials and manuals. Saving a new job rolls it out as work orders onto every vessel that has the equipment.
Manuals Where the Work Happens
Complete maker's manuals, drawings and datasheets attach to the equipment type; the pages a specific job needs attach to that job as extracts. Both sync to every vessel that installs the type and appear on the work order's manuals tab, so the procedure is at the workbench, not in a filing cabinet ashore.
Install, Migrate, Inherit
Install a type on any number of vessels in one action; each ticked vessel receives the equipment, its work orders and its stock rows. Install with last-known service dates so a migrated fleet lands with correct, even overdue, due dates. Fit out a new ship by inheriting a sister ship's whole equipment set, then rename or reposition units to match the vessel.
Change Control
Editing a strategy field on a critical job, such as its interval or basis, does not simply save. It raises a management-of-change draft holding the proposed change, so critical maintenance strategy is never altered silently. Crews on board can also propose registry changes, which the office reviews and answers, and the crew see the decision.
Frequently Asked Questions
Do I have to set up each ship separately?
Can I migrate an existing maintenance plan?
How are manuals distributed to ships?
What stops someone quietly changing a critical interval?
Ready to Put Maintenance on One System?
See Sealogic E-PMS run a vessel offline and a fleet ashore: work orders, running hours, spares, procurement, risk and dry-dock planning in one place.